COMPANY NAME
|
|
|
|
|
REPORT NO:
|
||
|
QUALITY ASSURANCE PLAN FOR
|
DATE:
|
|
|||||
|
TANKS.
|
SHEET : 1
OF 1
|
||||||
|
JOB NO :
|
|
|
CLIENT :
|
|
|
|
|
|
PROJECT :
|
|
CONTRACTOR :
|
|
|
|
|
|
|
ACCEPTED.
STD - APPLICABLE SPECS.
|
|
|
|
|
|
|
|
|
Sr. No.
|
Inspection Activity
|
Reference
|
Characteristic
|
Acceptance
|
Inspection Agency
|
|
|
|
|
|
Document
|
verified
|
criteria
|
CONTRACTOR
|
CLIENT
|
REMARKS.
|
|
1
|
RECEIPT
INSPECTION
|
|
|
|
|
|
|
|
i
|
Visual Inspection
|
Inspection Report
|
Damage
|
No Defects
|
W
|
R
|
|
|
ii
|
Document Review
|
Material T.C.
|
Correlation of
|
Specs.
|
W
|
R
|
|
|
|
|
|
Product with T.C.
|
|
|
|
|
|
2
|
WELDING
PRE-REQUISITES
|
|
|
|
|
|
|
|
i
|
Inspection of Consumbles (as applicable)
|
ASME Sec.-II, part-c
|
Correlation with T.C.
|
Mfr. Std.
|
W
|
R
|
|
|
ii
|
WPS/PQR
|
ASME Sec.-IX
|
Tensile/Bend
|
ASME Sec.-IX
|
W
|
W
|
|
|
iii
|
WPQT (Welder Qualification)
|
ASME Sec.-IX
|
RT
|
ASME Sec.-IX
|
W
|
W
|
|
|
|
|
|
|
|
|
|
|
|
3
|
TANK
FABRICATION/INSTALLATION
|
|
|
|
|
|
|
|
i
|
Set ups
|
WPS
|
Joint Configuration
|
WPS
|
W
|
R
|
|
|
ii
|
Welding Control
|
Electrode Specs.
|
Backing Time/Temp.
|
WPS
|
W
|
R
|
|
|
|
|
Specs.
|
Preheat/Interpass
|
Specs.
|
|
|
|
|
iii
|
Visual (Welds)
|
As per Code/Spec.
|
Weld Profile
|
Specs.
|
W
|
R
|
|
|
iv
|
PWHT
|
AS Per Drg.
|
|
|
w
|
R
|
|
|
v
|
HARDNESS
|
AS Per Drg.
|
|
|
w
|
R
|
|
|
vi
|
UT(as applicable)
|
As
per drg.
|
Weld Defects
|
Conf. to Specs.
|
w
|
w
|
|
|
ix
|
NOZZLE RAINFORCEMENTT PAD
|
Pneumatic test.
|
Weld Defects
|
ASME Sec.-IX
|
w
|
w
|
|
|
x
|
CELL TO BOTTOM
|
Chalk & oil test
|
Weld Defects
|
ASME Sec.-IX
|
w
|
w
|
|
|
xi
|
BOTTOM PLATE
|
Vaccum
|
Weld Defects
|
ASME Sec.-IX
|
w
|
w
|
|
|
xi
|
HYDRO TEST
|
WATER
|
Weld Defects
|
|
w
|
w
|
|
|
4
|
PAINTING
.
|
|
|
|
|
|
|
|
I
|
SURFACE CLEANING
|
ASME Sec,viii&b31.3
|
Surface Finish
|
|
w
|
R
|
|
|
II
|
PRIMER APPLICATION
|
ASME Sec,viii&b31.3
|
painting thick.as for drg.
|
|
W
|
R
|
|
|
III
|
FINAL PAINT
|
ASME Sec,viii&b31.3
|
painting thick.as for drg.
|
|
W
|
W
|
|
|
IV
|
FINAL DOCUMENTATION
|
AS -Built Drawings
|
Report
|
|
W
|
W
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Legend H=Hold
|
W=Witness
|
|
R=Review
|
|
|
|
|
|
|
CONTRACTOR
ENGINEER
|
|
CLIENT ENGINEER
|
|
|
||
|
|
|
|
|
||||
|
Signature
|
-
|
|
Signature
|
|
|||
|
|
|
|
|
||||
|
Name
|
-
|
|
Name
|
|
|||
|
|
|
|
|
|
|
|
|
Sunday, 26 February 2012
QAP FOR CS TANK FABRICATION & ERECTION
Labels:
CLIENT,
CONTRACTOR,
CS TANK,
ERECTION,
FABRICATION,
QAP,
TANK
Subscribe to:
Post Comments (Atom)
Nice Blog...
ReplyDeleteStorage Tank Manufacturers | Abi Engineering Chennai
Industrial Trolleys Manufacturer in Chennai
Storage Tank Manufacturers in Chennai
Nice articles and your information valuable and good articles thank for the sharing information Storage tank suppliers
ReplyDeleteWow this is a wonderful blog having all useful information. ASME storage tank
ReplyDeleteHeat exchanger
Industrial Silencer